Thankyou for taking the time to visit us here at KMI. All our products are proudly Made in the USA in our Belding Michigan facility. Please take the time to look around. If you have questions please check the contact area and feel free to browse our site. Links are provided to all our products as well as our secure online order page.

 

KMI 815 Front St. Belding, MI 48809 Toll free: 866-588-7088 616-794-0925 Fax   
Copyright © 2007 [KMI]. All rights reserved.

1. ROOF MELT IS DESIGNED TO BE TOSSED ONTO THE PROBLEM AREAS OF THE ROOF WHERE ICE DAM’S HAVE BUILT UP. BY TOSSING THE TABLETS ON THE ROOF, YOU ELIMINATE HAVING TO USE A LADDER OR EXTENSION EQUIPMENT. THE TABLET SHOULD BE TOSSED ONTO THE ROOF JUST BEYOND THE ICE AREA INTO THE SNOW.

 
 

2. TOSS 1 TABLET EVERY 1 SQUARE FOOT OF PROBLEM AREA. ROOF MELT BEGINS TO WORK FROM THE ROOF UP, MELTING CHANNELS THRU THE ICE SO THE WATER CAN SAFELY DRAIN TO THE EAVES OR THE GROUND. BUILT UP WATER UNDER THE ICE HAS NOWHERE TO GO, SO IT MAKES IT’S WAY INTO THE HOUSE.THIS PROCESS ELIMINATES THE WATER FROM GOING INTO THE HOUSE BY GIVING IT A WAY TO DRAIN.

 
 

3. ROOF MELT WILL BEGIN WORKING THE HOUR AFTER APPLIED TO PROBLEM AREA. IMPORTANT: THE CHANNELS ARE THE FIRST ACTION ROOF MELT BEGINS TO DO. YOU WILL PROBABLY NOT BE ABLE TO SEE IT WORKING AT FIRST, AS THE CHANNELS FORM BETWEEN THE ROOF AND THE ICE.

 
 

4. IF APPLIED EVERY SQUARE FOOT OF THE PROBLEM AREA, WITHIN 6 TO 10 HOURS YOU WILL SEE THE CLEARANCE OF THE ICE ON THE ROOF. IN MANY CASES COMPLETE SHEETS OF ICE CAN SLIDE OFF THE ROOF.  USE CAUTION WITH USE OVER PEDESTRIAN WALKWAYS.

 
 

5. AT WHAT TEMPERATURE IS ROOF MELT GOING TO WORK? THE ANSWER  TO THIS QUESTION IS NOT ALWAYS THE SAME. GENERALLY, ROOF MELT  WILL WORK UP TO 10 DEGREES BELOW ZERO. HOWEVER, BECAUSE YOU TOSS THE TABLET ON THE ROOF PAST THE ICE ONTO THE SNOW, THE SNOW ACTS AS AN INSULATOR AND ROOF MELT CONTINUES TO WORK  WELL BEYOND 10 BELOW.

 
 

6. ONGOING TESTING OF ROOF MELT HAS PROVEN NO LONG TERM  ADVERSE EFFECTS TO THE ROOF OR THE SURROUNDING AREA.

 
 

7. USING A 20 FOOT LONG AREA WITH ICE BUILDUP 1 FOOT IN WIDTH, 20 to 25 TABLETS SHOULD DO THE JOB. IF YOU HAVE AN AREA 6 FEET LONG
    WITH A WIDTH OF 4 FEET, 24 TO 28 TABLETS SHOULD DO THE JOB. IT IS IMPORTANT TO EXPLAIN THAT THE APPLICATION SHOULD BE APPLIED TO EVERY
    SQUARE FOOT.